DESIGN
40M
LONG, THREE SPAN POST TENSIONED CONCRETE BRIDGE WITH SPANS SUPPORTED
BY TWIN PILE BENTS AT THE PIERS AND ABUTMENTS.
TRANZ RAIL LTD. REQUIRED HOLMES TO UNDERTAKE THE FULL ANALYSIS, DESIGN,
DETAIL, AND DOCUMENTATION OF THE NEW RAIL BRIDGE - AND TO ALLOW THE
CONSTRUCTION OF THE BRIDGE TO OCCUR WITHIN A VERY SHORT TIME FRAME
DUE TO RAIL OPERATIONS.
RESULT
A
SIMPLE, ROBUST NEW RAIL BRIDGE, CONSTRUCTED ECONOMICALLY AND ON TIME
AROUND A VERY BUSY OPERATIONAL
RAILWAY LINE.
Our strength lies in knowing what it
requires to take away a client’s problems and give back solutions
that work and fit their needs. Demonstrating how to achieve this for
any project, in any civil or structural context at any scale, is our
business and passion. We are specialist bridging engineers with access
to the wider Holmes skill base. With environmental and architectural
services, fire and safety engineering, risk analysis and logistics,
resource consenting and consultation, we can assemble a project specific
team and work effectively for our clients.