Recent projects
 










Here is a recent selection of some of the projects Holmes Consulting Group has been involved with. Over the last 40 years we have completed more than 6000 projects. Click on the
"view now" button to find out more on each project.

Refurbishment and Base Isolation
Auckland Museum
A major refurbishment of one of New Zealand's most valuable heritage buildings.


Old Bank of New Zealand Refurbishment
The refurbishment of four 1900's buildings using base isolation.


Civic Theatre Refurbishment
A seismic refurbishment of significant heritage buildings.


Te Papa Museum
The new Museum of New Zealand. A spectacular waterfront complex.



High Rise and Low Rise Buildings
Ascott Metropolis
A luxury 40 storey New York style apartment building.


The Force Entertanment Centre
Cinema and Entertainment complex.


Canterbury University Science Complex
An education facility utilizing passive heating and ventilation.


Centra Auckland Hotel Extensions
A major extension to a 250 room hotel.



Stadiums and Wide Span Developments
Sasco Hangar
A 150 meter clear span twin Boeing 747 hangar.


Wellington Stadium
A 37500 seat stadium.


Christchurch Stadium
An 8200 seat indoor arena.


ASB Bank Stand
A 12000 seat grandstand.

 

Bridge Engineering
Bridge 2A Parnell Auckland
The longest double track concrete railway span in New Zealand.


Cobden Rail Bridge
Timber truss and beam bridge over the Grey river.


Bridge 51
Otira
Three span post tensioned concrete bridge.


PJK Expressway Tauranga
An integrated major expressway.

 

 


home | profile | seismic analysis | what we do
recent projects | drawing room | contact us | design guide

site design © webdesign 2001