Energy
We've worked in and around the energy industry for some time. For instance at Te Rere Hau, a windfarm for which we designed the wind turbine towers and innovative foundations.
We peer-reviewed the Southdown Co-Generation plant.
We designed a portable drilling rig platform for Boart Longyear as part of their work drilling for steam in the Central North Island. At the end of the drilling the platform is lowered and the rig and platform move to the next site.


